Club News  33








        (b)  Additional revenue will   (iii)  It is also anticipated that we   has been down for considerably
           derive from             will be able to obtain some   longer than this. (Note: The
                                   donations or sponsorships   Council have agreed to relay the
        ii(i)  Greater usage of the bar, ca-  on naming rights for the   track this year at their expense).
           tering and kiosk refreshment   new building or individual
           facilities in the new building.   facilities. Conservatively   In Conclusion
           These will be open 5 days   an additional £5k has been   Firstly on the base case, relative-
           per week plus weekends for   included in the plan.  ly conservative figures, income
           functions or as needed. This                 will cover the periodic track
           compares to 1 day a week   Additional Costs  maintenance and replacement
           plus occasional weekends for   i(i)   It has conservatively been   costs nearly three times;
           the current clubhouse bar   assumed that there will
           and catering. The plan fore-  be few economies in costs   Secondly at the end of 50 years
           casts net income from these   resulting from operating the   the Club would have sufficient
           sources will nearly double to   one, new facility at Norman   funds to buy the equivalent of
           just over £30k per annum.  Park compared to operating   Bourne Way;
                                   both the current buildings
        i(ii)  New revenue will be   at Norman Park and Bourne   Thirdly If income was only 75%
           generated from letting out   Way.            of our conservative projection
           various new facilities in the                and the periodic costs were
           new building. These include   (ii)  Additional costs amounting   50% higher we would still have
           physio rooms, the indoor   to nearly £40k have been   sufficient funds to more than
           sports hall/track and a num-  included in the business plan   cover these costs;
           ber of multi-purpose rooms   to cover additional staffing
           that can be let for anything   resulting from longer   Fourthly If, in the future, we
           from pilates or yoga classes                 were able to obtain grants
           to talks and meetings. For   operating hours and the   towards major refurbishments
                                   larger facility, and additional
           the physio rooms we have                     such as relaying the track, then
           an agreement in principle   costs for utilities, telephone,   an annual income of £25k,
           with the Crystal Palace   cleaning, security and   only a little more than we are
           Sports Injury Clinic and   equipment maintenance and   currently earning, would be suf-
           have built these figures   replacement.      ficient to cover future funding.
           into the business plan. For
           the multi purpose rooms   In so far as the 25 year cash
           we are already in talks with   flow forecast is concerned:
           interested parties. Based
           on these we have calculat-  Firstly, The following have been
                                built into the 25 year cash flow
           ed the earning potential
           from these rooms and then   forecast; secondly the track will
           conservatively halved it for   need either relining at £10k or
           inclusion in the business   completely respraying at £100k
           plan. We have taken a sim-  every 4 years; thirdly The pole
           ilarly conservative view on   vault and high jump beds, plus
           hiring out the indoor sports   the cage for shot etc. will need
           hall, assuming 10 hours   replacing every 12 to 13 years at
           hire a week. Revenue from   a cost of £110k; and finally the
           these sources will generate   track itself will need completely
           additional annual income of   relaying every 25 years at a cost
           over £70k.           of £260k. This is a conservative
                                assumption as the existing track